المدة الزمنية 33:33

MDM April 2021 Progress Video Standard Gauge Railway Line From Morogoro to Makutupora

7 535 مشاهدة
0
92
تم نشره في 2021/05/16

About Yapi Merkezi: YM is ranked as 78th in 2017 in the Top International Contractor’s List prepared by monthly magazine Engineering News Record (ENR). Besides it is ranked as 9th in 2017 in Mass Transportation / Light Rail Category of Top International Contractor’s List.

الفئة

عرض المزيد

تعليقات - 0